Do It Yourself Today!
 
Free Home Improvement Advice and Tips.

Home                       Submit Article                         Find a Contractor                        Tools                          Home Loans                      Home Plans

 

 

Air Conditioning
Bathrooms
Cabinets
Carpet
Chimneys
Concrete
Countertops
Decks
Decorating
Doors
Driveways
Drywall

Electrical
Energy Savings
Fences
Fireplaces
Floors
Gardens
Garage Doors
Gutters
Heating
Insects
Inspections
Insulation
Kitchen
Landscaping
Lawns
Lighting
Miscellaneous
Painting/Staining
Patio
Plumbing
Remodeling
Retaining Walls
Roofing
Security Systems
Siding
Stucco 
Trade Shows
Wallpaper
Windows

 

 

 

 

Google
 

How To Install Roof Shingles

Shingling a Roof

 

 

 

 

 

 
 

 

Shingling or roofing a house is a major undertaking for a homeowner and extreme caution is required. This said, a Do-It-Yourselfer homeowner can shingle or roof their own home with a little knowledge and the right tools.

Required Tools

In order to roof a house properly and safely the following tools are needed: Ladders, Roof Jacks, Hammer, Carpenters Knife, Chalk Line, and preferably a compressor or nail gun.

Estimating Materials

Typically the roof is measured in squares, where a “square” represents 100 square feet. There are eighty shingles in one square. However, when you go to your local home improvement store shingles are usually sold in bundles. Usually three bundles equal one square, however this can vary slightly pending the shingle style.

 
Measure the area of your roof (length x width) and divide by 100 to get the number of squares required. Then multiply this number by three to get the number of bundles of shingles required for the job. Add an additional 10-15% for spare, leaning toward the 15% if your roof has hips and valleys.

Drip edge, ice and water shield, asphalt paper, flashing, roofing nails, and hip and ridge vents will also be required. The Drip edge comes in various lengths. Measure the outside perimeter of the roof to calculate the drip edge required. The ice and water shield, asphalt paper and flashing come in roles. Use your roof square area calculation for determining your asphalt paper requirements. Typically only one or two courses of ice and water shield is required along the bottom/eave of the roof and in the valleys. Calculate 2 times the length of the roof and valleys to estimate the amount of ice and water shield required.

Typically each shingle will require 4-6 roofing nails and flashing usually comes in 16” wide roles or 6x6 or 8x8 square inch steps. Step flashing is typically used around chimneys, dormers and side wall junctions. Hip and Ridge vent will vary with local building codes, however a rough estimate would be to measure the length of your roof’s hip and ridges and take 75% of this figure for calculating the amount of vent required.

You should now be able to fairly accurately calculate the cost of material for roofing your home.

Installing the Drip Edge

Nail the Drip edge around the entire outside perimeter of the roof.

Apply the Ice and Water Shield Membrane and the Asphalt Paper

Apply the ice and water shield material such that it is flush with the drip edge. If the climate in your area has harsh winters and/or significant annual rainfall, add a second course of ice and water shield for added protection. You should also add the ice and water shield membrane in the valleys.

Next apply the asphalt paper to the entire roof, starting from the bottom and working towards the ridge. Make sure each course of asphalt paper overlaps the lower row by several inches (effectively shingling with the asphalt paper).

Install metal flashing

Install metal flashing in all of the valleys. Step flashing around chimneys and dormers will be added as the shingles are installed.

Installing the Shingles

Start the shingling at the bottom of the roof (or at the eaves). Lay a starter course such that the bottom edge of the shingle lines up flush with the drip edge. The starter strip is a “tabless” shingle that you make from the regular shingles using your carpenter’s knife.

Lay your next course of full shingles over the first course, staggering the starter joints from the first course to prevent water penetration.

Note: Sometimes you may want to start with a full or a partial shingle at one end. In either case, you want to try to avoid small shingle pieces at the far end of the roof. To prevent this, divide the length of the roof by the length of a full shingle and assess how much of a shingle length you want to start with. Ideally you do not want to have pieces smaller than 12”.

Use a Chalk Line

To ensure your shingle courses run straight use a chalk line. Measure the finished reveal on your shingles. Usually this is about 5 inches. Then make marks every 5 inches on the gable ends of the roof. Snap a chalk line between the gable ends at each pair of marks all the way up the roof. This will ensure that you shingles run true and straight as you progress up the roof with the courses.

Vertical lines should also be snapped every 3 to 6 feet to ensure your tabs maintain alignment.

Use of Roof Jacks

After 3 or 4 courses of shingles have been installed using ladders, roof jacks may be necessary to access the upper courses. Roof jacks are steel brackets that hold planks in position for you to stand on. The roof jacks should be securely nailed through the decking and into rafters to ensure that they will support your weight.

Shingling Valleys, Chimneys, Skylights and Dormers, and Step Flashing

Shingling the valleys and installing flashing requires extra care. The shingles, typically coming from two intersecting courses when entering a valley, need to overlap each other such that no water penetration occurs.

Skylights, chimneys and dormers must be step flashed (step flashing is interleaved with each course of shingles) to ensure water is kept from penetrating the roof.

Adding the Ridge Vent and Caps

To complete the roofing project, ridge vents need to be installed. These are nailed to the top of the ridge and then capped.

The ridge cap prevents water from entering the home via the ridge vent, while still allowing the house to breath. The ridge cap is constructed out of individual shingle tabs that have their unfinished corners cut off at 45 degree angles. Each modified shingle tab, is nailed such that it overlaps the previous piece as you work your way down the length of the ridge vent.

For more help on Shingling Your Home's Roof, see HomeAdditionPlus.com’s Asphalt Shingle Roofing Bid Sheet at http://www.homeadditionplus.com/Bid-Sheet-Ebook-info/Asphalt-Shingle-Roofing-Bid-Sheet.htm. The Asphalt Shingle Roofing Bid Sheet will help to ensure that your roof won't end up with a blue tarp over it and a dumpster sitting in your yard for weeks as you wait for the roofing contractor to come back and finish roofing your home.
 
Over the past 20+ years Mr. Donovan has been involved with building homes and additions to homes. His projects have included: building a vacation home, building additions and garages on to existing homes, and finishing unfinished homes. For more Home Improvement information visit: http://www.homeadditionplus.com and http://www.homeaddition.blogspot.com


 


Search for Foreclosures Nationwide.

 Find Local Roofing Services. Get Up to 4 Quotes Now. It's Quick, Free, and Easy!

 

Related Advice and Tips:

Replacing A Broken Roof Tile - DIY - Do It Yourself
How To Replace A Damaged Asphalt Shingle
How to Measure your Roof for Shingles
How to Repair a Tile Roof
Installing Cedar Roof Shingles
How To Install Roof Shingles
How to Install Roof Flashing
How to Repair or Fix a Roof Leak
How to Install a Ridge Vent
How to Repair a Leaking Pipe Boot on Your Roof
How to Find a Leak in a Flat Roof
How to Install Roof Slates
Roof Protection
Choosing Roofing Materials
Prevent Roof Damage
Basic Roof Problems
Roofing Materials: Flat Roofs
Metal Roofing Materials
DIY: Do it Yourself Roofing Tips
Corrugated Roofing Materials
All About Roofing
Roofing: Shingle Maintenance
Replacing Roofing
Metal Roofing
Roofing Styles and Materials
Estimating Roofing Materials Cost
Fiberglass Roofing Panels
 

 

 

 
 

Contact Us        Terms of Use        Privacy Policy        Resources       Sitemap        Our Blog      Add A Link

Copyright 2007 - 2011 ©,  J. Holt & Associates, All Rights Reserved